In
2006, Huanghua Port achieved a seaborne coal
sales of 79.2 million tonnes, representing
a year-on-year increase of 12.1 million tonnes,
or 18.0%.
Shenhua Huanghua Harbor Administration Company
improved loading & unloading operation
and further dredged
sailing channels to -13 meters, assuring a
24-hour in-and-out sailing of vessels with
a capacity of 50 thousand tons. The handling
throughput increased by ten million tons for
a fourth year in a row.
The Shenhua Tianjin Coal Dock is located at
the east end of Nanjiang Port at Tianjin Port,
having three berths. Its construction was
completed in October 2006. It is an important
channel for seaborne transportation in our
transportation system. It has a designed annual
coal handling capacity of 35 million tonnes
and it is estimated that by the end of 2007
when the fourth unloading line is completed,
its annual coal handling capacity will be
increased to 45 million tonnes. As it benefits
from the sound infrastructure of Tianjin Port,
including the deep water route of 200,000-tonne
class and the professional port services,
the Shenhua Tianjin Coal Dock can accommodate
one 150,000-tonne class and two 70,000-tonne
class large vessels at the same time.