Coal liquefaction segment

DCL project:Great efforts has been made on the construction of the DCL project. Exerting our intelligence and solving all kinds of problems, we ensured on-time delivery of super large equipment, successful installation of over-sized equipment and completion of civil engineering for the overall framework. We have finished civil engineering and made major progress in the equipment installation ensued, such as successful installation of CTL reactor, gasifier and hydrogen reactor. The coal silo has been completed and external water supply system has been finished. We have finished the detailed design of each phase and each part of the project, and we have finished purchasing of key equipment, large batches of material, electronics and meters. Over 80% of the equipment and most of the pipelines and electronic material are ready on site. The project HSE, as well as its quality, progress and cost are all in control. The investment for the year stood at RMB 436.9 million. Since the kick off the construction, the accumulative investment has reached RMB 763.9 million and 75.17% of the construction has been completed, following our timetable.

Coal chemicals project: All the civil engineering and most of the installation has been completed for the Shenhua Ningxia Coal (Group) Industry Corporation methanol project with a capacity of250 thousand tons per year, and the 220-ton boiler passed commissioning. The major part of civil engineering has been completed for the supporting DME project with a capacity of 210 thousand tons per year. Negotiation on introducing
patent and overall engineering design has been completed for the olefins project with a capacity of 520 thousand tons per year, and its construction commenced. The coal to olefins project in Baotou has been proved by related governmental authorities and is in progress. The phase 1 of Wuhai coal tar processing project with a capacity of 300 thousand tons per year has commenced trail operation. Shenhua Group is
actively negotiating with Sasol and continues to push forward the feasibility study on ICL projects in Shenhua Ningxia Coal (Group) Industry Corporation and Shaanxi. After rounds of negotiations with Dow Chemicals, we optimized the prefeasibility study of our Yulin coal chemicals project. We signed agreement on feasibility study with Shell on Shenhua Ningxia Coal (Group) Industry Corporation ICL projects, and initiated related preparations. Preparatory works have also been carried out to coal chemicals projects in Xinjiang, Hulunbeier and Tongliao. Basic engineering design has been completed for Shenhua ¡°829¡± project.
Copyright: Shenhua Group Technical support: Group Information Center Tel:86-10-58132001¡¢58132114
E-mail:shjt@shenhuagroup.com.cn Web site£ºwww.shenhuagroup.com.cn
Address: Guohua Investment plaza,No.3 Dongzhimen South Street,Dongcheng District,Beijing ,China 100007
Building use IE (1024 * 768) on the site by 05033623, Beijing ICP